| |
|
Home step by step
-
You will visit the building plot before signing the building contract. This enables us to mark out the house layout, to assess ease of access to the house, to decide on the best house model for the site and to decide where the utilities are to be placed;
-
The signature of the building permit application: the client will sign the application, the various plans, the application for ‘permission de voirie’ (permission to encroach on a public highway during works) and the application for permission to install drainage (demande d’installation d’assainissement) (if needed). Maisons Traditionnelles will then deliver the full dossier to the local town hall where the building plot is located and take delivery of the dossier receipt;
|
|
|
|
CONSEIL
ARMATURES D'AQUITAINE
Sol et eaux
INTHE
|
|
| |
|
|