» Home » Notre société » Construire en étape » Nos réalisations » Savoir-faire » Notre catalogue » Contrats et garanties » Contact
 
CONTACTEZ-NOUS
CONTACTEZ-NOUS
 

PARLEZ-NOUS DE VOTRE PROJET
  • En quelques lignes décrivez-nous votre projet
  • Avec ces renseignements nous pourrons préparer une étude personnalisée


 
location France gestion immobilière

Search
 
 

INTRANET
  • Login :
  • Pass :
  •  

    Contrats et garanties

    "For more than 20 years, we build houses personalized by traditional type, conceived to last... "

    * The contract of construction it is 3 prices, 5 suspensive conditions and 3 periods. It is at present the best protections which offers simultaneously to the Project owner a total security thanks to the Law of 1990, guarantees and compulsory insurances. It fixes the legal periods and a legal framework which protects entirely the Project owner.

    * Guarantee of delivery at prices and agreed periods


    In guarantee of his commitment to realize the works object of the contract, at price and in agreed periods and also in case of his own failure, the builder proves an agreement of caution money by which the authorized body, obliges, as from the date of opening of the construction site, to take care of the risks of non-fulfillment or bad execution of the works foreseen to the contract so Aas well as to indicate if need be, another builder or entrepreneur to finish the house

    * Insurances


    The builder declares to be insured against the pecuniary consequences of his professional responsibility which could be engaged in application of articles 1792 and following ones and on 2270 of the Civil code.
    He will prove in the opening of construction site of the existence of the asssurance which it is legally anxious to sign by virtue of the article L241-1 of the Code of the Insurances

    The builder will sign for the boss of the work the Damages - work police, except express will of the boss of work to make his personal affair of the subscription of this contract.
    The builder makes a commitment to respect the guarantee of perfect completion of one year as from the reception. This guarantee does not extend in the necessary works to remedy the effects of the normal wear, of a neglect or a misuse.
    It is besides clarified that the Boss of the Work will make sure himself against fire risks, storms and hurricanes as from the stage outside water

    * Guarantees of perfect completion and smooth running


    a- During the first year which follows the reception, you benefit from a guarantee of perfect completion for the works having been the object of the contract.
    All the disorders revealed during the reception or indicated first year must be repaired by your builder

    b-During two years which follow the reception, you benefit from a guarantee of smooth running concerning the elements of equipment which we can separate from the construction, under reserve that they are included in the works object of the contract.Your entrepreneur is anxious to repair or to replace these elements of equipment (shutters, doors, electric installation, boiler, etc.) the bad functioning of which is obvious, safe in case of abuse of custom or defective maintenance

    * Guarantees owed by the insurers


    a- During ten years which follow the reception, you benefit from the ten-year guarantee. Your entrepreneur is anxious to make sure as such. This insurance has for object the repair of the disorders which compromise the solidity of the building and do not allow to use it according to the planned usage). The inseparable elements of equipment of the building of walls, roof, networks are also insured

    b-As from the expiration of the guarantee of perfect completion, that is one year after the official acceptance of work, you can address the establishment where was signed the insurance damages-work to the case or the disorders quoted in the previous "a" would appear and would not be repaired by the builder

    The insurance damage-work guarantees you, if it was necessary, except any research for responsibility, the payment of the repair works of the damages for which are responsible companies under - traitantes to your builder

    * Guaranteed Subcontractors


    The company the South Environment signed a contract with Euler Hermes SFAC credit to guarantee her subcontractors.
    These bodies are subsidized by the ministry loaded with the development.

    * For your comfort, all our models equipped with electric heater respect the standard RT on 2005.


    News
     

    TROUVEZ VOTRE TERRAIN

    Particulier ou professionnel, un large choix de terrains sur la région,

    Vu pour vous

    TROUVEZ VOTRE TERRAIN
     

    NORMES ET LABELS
    • RT 2005, RT 2010 et RT 2012
    • Haute Performances Energétiques
    • Diagnosys of Energy Performance
    • Label HPE 2005, THPE 2005 et BBC 2005
     

    PARTENAIRES ANGLAIS
    GSI
    CAMILLE CONSTRUCTION
    CEGERIS
    COVEA CAUTION
    CAUTION MUTUELLE
    SMABTP (assureur technique)
    COVACOVEA RISK (assureur technique)
    GDF DOLCE VITA
    BET AMOUROUX
    TECHNOSUD ENERGIE
    DIAGAMTER
    TELLUS DEVELOPPEMENT
    IMMOBILIER JARDIN
    CIRTER (étude de sol)
    CM2 (étude béton)
     

     

     
    Maisons Traditionnelles - Stéphane IZARD - 21, rue Léon Cladel - 82 000 Montauban - Tél 05.63.20.10.42 - Fax 05.63.66.23.94 - info@maisonstraditionnelles.fr
    Design and realization : www.quick-info-services.com - legal notice - contact - search history - tags